2007

- Electrical Power supply for the NAVAIDS buildings - Doha International Airport – Qatar

- Modification of Dubai Airport Royal Wing Baggage handling System.
Rebuilding of the Royal Wing  Belt system to simplify operation from an S shaped  system to a C shaped  system and adjusting the necessary controls to enable all the belts to run at similar speed, integration with the X-ray Machine and Building monitoring system - Dubai International Airport - Royal Wing

- Design, Fabricate, Supply, Installation, Training , Spare Parts, Testing, Commissioning and Flight Check Assistance of 2 ILS/DME catIIIB (Instrument Landing System, Distance measurement Equipment) - New 2K Runway part of the Expansion Plan of Abu Dhabi International Airport

- Supply , install and commission the MALMS mobile airfield lighting calibration system  including a photometric bench - Dubai International Airport

- Qinetiq: Project Management, Installation and Warranty for Tarsier Radar System (Foreign Object Detection Radar) - Dubai International Airport

- Terminal 1:  Upgrade of the Flight Information Displays Systems - Abu Dhabi International Airport

- Design, Supply and Installation of Ground Movement Guidance, multi-laterations systems - Jebel Ali International Airport

- VCCS system and control equipment - Jebel Ali International Airport

- Design,  Installation and Supply of UHF/VHF Radio system - Jebel Ali International Airport

- Supply, Installation, Testing and Commissioning of UHF/VHF Radio Equipments - Abu Dhabi International Airport

- New Etihad Terminal - Abu Dhabi International Airport : Supply, Installation, commissioning and Warranty of the following airport systems:
    Flight Information Display System (FIDS)
    Baggage Reconciliation Systems (BRS)
    Common Use Terminal Equipment ( CUTE)
    Public Address Systems & Voice Alarm ( PA/VA)
    Master Clocks Systems  (MCS)
    Master Antenna Television (MATV)
    Local Area And Wireless Network
    Structured Cabling System for all the above systems.

- Supply and installation of ILS & NBD (Runway 12) - Doha International Airport - Qatar

 

2006

- Digital end to end Communication Systems for new ATC centre of GCAA - General Civil Aviation Authority

- Upgrade and Expansion of Air Traffic Control Simulator - Dubai International Airport

- Turnkey project : Instrument Landing System for the South Runway - Dubai International Airport

- Turnkey project : Instrument Landing System Cat IIIB - Jebel Ali International Airport



Abu Dhabi International Airport

2007

- Replace the CRT  by new TFT Displays  and  Upgrade the System Configuration

2006

- Upgrade of the Flight Information Display System Database

- Replacement of CRT displays by TFT for the FIDS System

2005

- Turnkey Project : Passanger Handling, Departure Control and Baggage Reconcilation Systems (DCS, BRS, PH)

- Turnkey Project : Special Systems for T2 & T1A (DCS, FIDS, Public Address)

2004

- Supply & Installation of an Airfield Lighting Calibration System

- Supply & Installation of Fibre Optic Bakcbone for Radar and Navigation Systems

2003

- Interactive TV system for the Airport Hotel

- Supply & Installation of Communication Systems for the Emergency Control Tower: Radios, VCS, Recorders, ATC Console …

2002

Refurbishment of FIDS system

2001

- Renewal and Development of Navigationl Aids Systems: ILS, DME, RVR, Radios

- Supply & Installation of Meteorological Information Display Systems

1999

Turnkey project: Flight Information Display System (FIDS)



Al Ain International Airport

2006

Supply & installation of Digital Recording and PlayBack for the ATC Tower

2005

Turnkey Project : Passanger Handling, Departure Control and Baggage Reconcilation Systems (DCS, BRS, PH)

2004

Supply & Installation of Fibre Optic Bakcbone for Radar and Navigation Systems

2000

Turnkey project :  Flight Information Display System (FIDS)



Dubai International Airport

2005

Turnkey project : Instrument Landing System CatIIIB

2003

- Tunrkey Project : Ground Movement Radar GMR

- Security Control and Monitoring Center: CCTV & Control Centre

2002

Supply & Installation of Radar Simulator



Sharjah International Airport

2006

Supply, installation and commissioning of 1 Instrument Landing System

2005

Local Area Network for Departure Control System



Military Site

2006

Turnkey Project : Air Traffic Control Systems for the UAE Air Force




Pages: 1 2