Routing & Switching

 

Picture5_3.jpgADNOC Petroleum Institute

Project: Petroleum Institute

Supply, Installation, testing and commissioning of Foundry BigIron RX Core Switches and FastIron Edge Switches X Series 484 edge switches.

  

 

Picture4_4.jpgUAE Central Bank

Project: Network Infrastructure for Image Cheque Clearing System

Supply, Installation, testing and commissioning of Cisco ATM Routers, Server Switches and FortiGate Unified Threat Management System

  

 

 

Picture6_1.jpgMinistry of Justice

Project: Sharjah & Um Al Quwain Courts

Installing Foundry Backbone and FES edge switches with PoE. Also installed 700 Cisco IP Telephones, with Cisco Call Manager and Unity Servers

 

 

Picture7_1.jpgNational Drilling Company

Project: WAN Bandwidth Management and QoS

Installing 95 10/100/1000 Edge switches and 2 BI MG8 backbone switches, with 10GB backbone. Installing Foundry Access Points to cover 100% of the campus.

 

Picture8_2.jpgEmirates Media

Project: Network Infrastructure

Installing Foundry BigIron RX Core switch. Interconnect all floors, and different media buildings within Emirates Media Compound.

  

Picture9_2.jpg

Etisalat Telecommunication

Project: Sharjah (Etisalat) University

Installing 95 10/100/1000 Edge switches and 2 BI MG8 backbone switches, with 10GB backbone. Installing Foundry Access Points to cover 100% of the campus.

 

 

 



Structured Cabling

  

Picture11_1.jpgSharjah University

Project: Health & Medical Science College

Installing CAT 6 6000 STP network outlet (data and voice) for the medical and health science college (5 buildings). It includes OM3 MM indoor backbone fiber connectivity and outdoor inter-campus fiber cables.

 

Picture12_1.jpgPublic Works Department

Project: Gulf LibraryCentre for Documentation and Research

Installing, testing and commissioning of the largest library in the UAE (Cat 6 Data/Voice, OM3 Fiber Optics) working with Consultant: Al Borj
Contractor: Al Faraa

 

Picture13_1.jpgESNAAD

Project: Network Infrastructure

Supply, installation, testing and commissioning of CAT6 Data / Voice cables and outlets and MM Indoor/Outdoor Fiber Cables.

 

Picture14_1.jpgPublic Works Department

Project: Sheikh Zayed Bin Sultan Al Nahyan Mosque - Abu Dhabi

CAT6 voice and data points, indoor multipair 25 pair CAT3 voice cable, Indoor Multimode 62.5 and 50 micron fiber optic cable.

 

 

Picture9_2.jpgEtisalat Telecommunication

Project: Dubai Headquarters

Supply, installation, testing and commissioning of CAT7 6000  network outlet, OM3 Fiber Backbone, and intelligent structure (patch panels, patch cords, and analyzers) in Dubai

 

 

 

Picture10_1.jpgAbu Dhabi Company for On shore Oil Operations ADCO

Project: North East BAB (NEB)

Supply, Installation,testing and commissioning of 3000 Cat 6 data and voice outlets, MM 50 Micron Fiber Optics (Indoor and Outdoor) within four complexes in Dhabea, Abu Dhabi

   

 

 



Advanced Technologies

Picture7_6.jpgAl Tayer Motors

Project: Setting Up Converged Network

Design and deployment of Structured Cabling, Local Area Network and  IP Telephony systems

 

Gulfnews_2.jpgGulf News

Project: IPT Infrastructure

Design and deployment of  IP infrastructure

 

27919_raknewlogo.jpgRAK - FTZA

Project: Multi - Tenant IP Communication Solution

Design and deployment of Structured Cabling systems

Design and implementation of IP communication solution.




Pages: 1